FR / Wind power: 42 winners for the 10th period of the PPE2 call for tender
952.8 MW, for an initial power demand of 925 MW: this is the cumulative capacity of the 42 projects selected under the 10th period of the PPE2 (Multiannual Energy Framework 2019/2028) onshore wind call for tenders, News Tank learned on 04/11/2025.
A total of 90 applications were submitted between 30/06 and 11/07/2025, for a cumulative capacity...
